Marine Notice No. 33 of 2005
GRAND CANAL - BARROW LINE
Temporary Closure
Waterways Ireland wishes to advise all Masters and Users of the Grand Canal that a temporary closure of the Barrow Line, from Ballymanus Bridge to Milltown Bridge, will take place from 7th November 2005 until 17th March 2006 to facilitate dredging operations.
Further information may be had from the Eastern Area Regional Office Tel: +353 (0)1 8680148.
Charles J Lawn
Lt Cdr
Inspector of Navigation
1st November 2005.
Tel: 00 353 (0)90 6494232
Fax: 00 353 (0)90 6494147
